What a summer we finished the foundation work for the Alaska facility. As soon as the ground thaws we are full steam ahead on the new hanger. The Stinson came out with an empty weight of 1269 lbs. Really flys great.
Blog
We ended up going with Stitts on the Huskey project. The owner is working with me in my shop on his tail group and doing a great job. One Stinson wing is through the white base coat and the other is ready for tapes. 
We are flying into 2017 at full throttle. The wings are getting new Stitts cover on the Stinson 108 Bobcat conversion/total rebuild. The tail is off the Tehama Ranch Husky and I am excited to see how the new Oratex covering works out. I am contracted out until April for some local helicopter operations. Then we start construction on the new hanger/shop in Sterling Alaska.
